Car insurance

Posts Tagged ‘commercial centers’

PACTS Regional Bike and Pedestrian Plan Update: Section A, Final Draft

December 8th, 2009

 

PACTS Regional Bicycle and Pedestrian Plan Update November 2009 Final Draft

Note to Reader: This DRAFT report has been broken into four sections on this website to make it easier to read. Near the top of each section is a link to the PDF version of that section.

THE FINAL REPORT IS AVAILABLE HERE.

Below is an index of all the sections and links to them.   Several maps are referenced in this site and are linked where appropriate within the website.   Also on this page, below the index, is a comprehensive list of links to all sections as PDF’s and all the supporting maps.


Draft Report Section Index

A. Introduction – Draft

B. On-road Bikeway, Trail and Pathway Networks – Draft

C. The Pedestrian Environment and Regional Commercial Centers – Draft

D. Top Cost and Time Effective Regional Improvements – Draft

E.  Top Areas/ Issues of Concern for Follow Up – Draft

F. Design Guidelines – Draft

Download the entire DRAFT report here:

PDFs: Sections A, B, C, D, E, F

Supporting Maps: Map B-1, Map B-2, Map B-3, Map B-4, Map B-5, Map C-1, Map D-1, All Maps

Download this section as a PDF here.

A. Introduction

Purpose and Scope of the Regional Bicycle & Pedestrian Plan Update

The purpose of the Regional Bicycle and Pedestrian Plan Update is to selectively update sections of the PACTS Regional Bicycle and Interim Pedestrian Plan from 1995. Eight communities have been added to the PACTS region since 1995. Much has changed within the region from a planning perspective as well as from the amount of bicycling and pedestrian infrastructure that has been constructed. Significant portions of the on-road bicycle network from the 1995 Plan are beginning to emerge. Many miles of trails and pathways have been built in the intervening years, with many more planned.

Since 1995 there is certainly a heightened awareness of the importance of bicycling and walking to the sustainability of the region’s multimodal transportation system and to the region’s livability. Nationally, increasing the amount of adult and youth physical activity is a major strategy to decrease chronic illness such as diabetes and rising obesity rates. Bicycling and walking are integral to these strategies.

The Plan Update is principally an update and expansion of the infrastructure and facility inventory map of the 1995 Plan to include the new 8 communities that have joined PACTS since 2000 (Freeport, North Yarmouth, Yarmouth, Cumberland, Windham, Old Orchard Beach, Saco and Biddeford). The On-road Bikeway, Trail and Pathway Networks section (B) contains a map inventory of the existing and planned on-road bicycle facility, trail and pathway networks in the 15 PACTS municipalities.

Additional elements that are part of the Plan Update document are:


Overview of the Process

The heart of the Plan Update process was a series of meetings held with municipal representatives and bicycling, pedestrian and transit stakeholders within the region.

The process included the following elements

  • An initial series of kick-off meetings (June 2009), with towns and cities grouped by the Plan Update’s four sub-regions, was held at the beginning of the project with municipal staff. Staff provided information, plans and data to be considered during the course of the project.
  • Three monthly meetings were held with stakeholders and advocates/advocacy organizations to review the plan’s progress and get invaluable input into the project’s direction.
  • A second series of meetings (August 2009) with municipal staff was held to review the draft network maps and other plan update materials.
  • Periodic project updates to the PACTS Planning, Transit and Technical Committees and consultations with PACTS staff.


Next section:

B. On-road Bikeway, Trail and Pathway Networks


PACTS Regional Bicycle and Pedestrian Plan Update: Section B, Final Draft

December 7th, 2009


PACTS Regional Bicycle and Pedestrian Plan Update November 2009 Final Draft


Note to reader: This is section B of a 6 part report. To see the entire report click here.

THE FINAL REPORT IS AVAILABLE HERE.

Download this section as a PDF here.

B. On-road Bikeway, Trail and Pathway Networks

Overview of the Networks and Maps

The inventory and maps of the Bikeway, Trail and Pathway networks are the heart of the Plan Update project. The maps are a snapshot of the existing and desired future networks of facilities to provide bicycle and pedestrian access to destinations within and to the PACTS region as of October 2009. The bicycle and pedestrian-related facilities identified on the network maps are:

  • On-road Bikeways – Bicycle lanes, Paved shoulders and Shared lanes
  • Trails – Regional and Local
  • Shared Use Pathways – some within their own right of way and some shared with rail and utility rights of way.

Facilities are shown as ‘Existing’ (solid line) or ‘Future’ (dashed line). Trails that are local in nature are thin green lines; those that provide regional connections are thicker green lines.

The maps also provide information important to the context of the bicycling and walking networks within the region. This information includes:

  • Conservation, Recreation Facilities and Open Space areas – these are often key destinations for cyclists and walkers
  • Rail lines – active and inactive, that may be important trail or pathway corridor opportunities, with or with out active rail service sharing the corridor
  • Bus routes – transit services require quality pedestrian access to be successful and bicycling can extend the effective range of transit services where coordinated
  • Intermodal centers – are important destinations for bicyclists and pedestrians
  • Park and Ride Lots – can serve bicyclists and pedestrians as transfer points for transit services or carpools/vanpools
  • Municipal Growth Areas from approved Comprehensive Plans – bicycling and pedestrian infrastructure is important to support municipal growth management and travel demand management strategies
  • Schools – important bicycling and pedestrian destinations for students and the broader community.

The facilities comprising the networks come from a number of sources. The starting point was the 1995 PACTS Plan and the bicycle and trail plans several PACTS towns and cities have undertaken. New facilities were suggested to be added to the networks at the meetings with municipal staff, trails organizations and advocates over the course of the project. Once they were compiled, additional facilities were added to ensure connectivity of the networks between municipalities and broadly within the region. For instance, planned on-road bikeways sometimes did not align at municipal boundaries and some regional destinations, such as state parks, did not have connections.

The network maps are provided at two scales: a regional map (Map B-1) showing the entire PACTS region and sub-regional maps that provide improved legibility. PACTS communities were grouped into four sub-regions:

  • North: Falmouth, Cumberland, Yarmouth, Freeport, North Yarmouth (Map B-2)
  • Central: Westbrook, Portland, South Portland, Cape Elizabeth (Map B-3)
  • South: Scarborough, Old Orchard Beach, Saco, Biddeford (Map B-4)
  • West: Windham, Gorham (Map B-5).



On-road Bikeways

Different on-road bicycle facilities provide distinct levels of accommodation and perceived safety for cyclists. Their application is dependent upon a roadway’s characteristics and its context. Three types of on-road bikeway facilities are included on the inventory: Bicycle lanes, Paved shoulders and Shared lanes.

A large number of variables must be considered and balanced when selecting an on-road bicycle facility for a particular road. These variables include:

  • existing road pavement width (and the potential for widening)
  • number of travel lanes, their width and their configuration
  • traffic volumes – existing and future
  • traffic speeds – posted speed limit and actual traffic speed
  • composition of the traffic (such as the volume of trucks, buses and RVs)
  • the skill level of likely cyclists using the facility
  • the presence of on-street parking and its turnover rate
  • the continuity of bikeway facility-type that can be achieved (frequent transitions between facility types within short distances should be avoided)
  • surrounding land use and environment – urban, suburban, rural and types of activity centers/destinations.

While there is longstanding debate among bicycle planning professionals and advocates about this point, current bicycle facility design guidelines (such as AASHTO’s Guide for the Development of Bicycle Facilities, 1999) generally call for greater distance separation between cyclists and motorists on roadways, where feasible, as traffic speeds and volumes increase to reduce the amount of interaction between the two. Those that disagree with this general design principle feel that this separation creates a false sense of security for less skilled bicyclists.

bicyclelane-next-to-parking

Bicycle lanes are designated bikeways that have stenciled bicycle symbol pavement markings and often have accompanying roadside signs.  Bicycle lanes are designated for exclusive or preferential use by bicycles.  They may be located on streets with or without on-street parking. On streets with parking, the lanes are placed between the travel lane and the parking. An example of urban bicycle lanes with curbing and on-street parking is located on Brighton Avenue in Portland. An example of bicycle lanes on a suburban, uncurbed roadway is Route 88 in Falmouth.

The minimum recommended width for bicycle lanes is 4’ (AASHTO, 1999). Additional width is recommended when the bicycle lane is located next to curbing or next to on-street parking (5’ minimum recommended), or on streets with higher traffic speeds and volumes (possibly up to 6’).

The vast majority of bicycle lanes within the region are being created by reallocating existing pavement width to define the bicycle lanes. Space for bicycle lanes can often found by narrowing travel lanes and parking lanes, or eliminating parking lanes or travel lanes, or a combination.

paved-shoulder-on-curbed-streetPaved shoulders are located to the right of the outside travel lane and delineated by a white pavement stripe. They are not designated specifically for use by bicycles but are available for bicycle use and provide room for separation from motor vehicle traffic. Paved shoulders are located on roads with and without curbing. They are distinct from on-street parking lanes.

The minimum recommended width for paved shoulders (AASHTO, 1999) to provide quality accommodation for cyclists is 4’. Additional width is recommended when the paved shoulder is next to curbing or on streets with higher traffic speeds and volumes. In addition to safety benefits for cyclists, paved shoulders also have motorist safety and pavement preservation benefits. Wide paved shoulder widths (over 6’ for instance), especially in combination with larger clear zones along roads, can contribute to increased traffic speeds, diminishing their potential benefits for cyclists.

Local examples of paved shoulders are Route 25 between Gorham and Westbrook and along much of Route 1 in Falmouth, Cumberland and Yarmouth.


Shared Lanes are roadway travel lanes that are shared by motorists and bicyclists. Shared Lanes, as a bicycle facility, are often used where the roadway is not wide enough to provide another facility such as a bike lane. Shared Lane pavement markings, also called Sharrows, may be appropriate if the Shared Lane is part of a designated bicycle route (see F – Design Guidelines). Sharrows are currently an experimental pavement marking and require permission from the FHWA to use. ‘Share the Road’ signs are often placed along roads where an on-road bicycle facility may transition, due to reduced pavement width, from a bicycle lane or paved shoulder to shared lane facility.

wide-curb-lane-next-to-parkinglane

Shared lanes may be of two types:

  • typical travel lanes 10’ to 12’ wide that require motorists to change lanes or cross the center line to safely pass cyclists with 3’ of clearance
  • wide curb lanes that have additional width (13’ to 15’ wide) and allow motorists to overtake and pass cyclists without changing lanes.

Local examples of existing shared lanes are Main Street/Route 1 in Freeport Village, Main Streets in Biddeford and Saco, and West Grand Avenue in Old Orchard Beach. Examples of wide curb lanes are on Broadway south of Millcreek in South Portland and much of Main Street in Westbrook.


Shared Use Pathways are intended for multiple types of path users including bicyclists and pedestrians. They have a firm, compacted surface (paved, stone dust, etc) that serves road bicycles well. Depending upon the type of surface, roller bladers and equestrian users may also use the path. Local examples of paved shared use pathways are the Eastern Promenade Trail (right) in Portland, the South Portland Greenbelt in South Portland, and the Beth Condon Pathway in Yarmouth. An example of a stone dust pathway is the Eastern Trail through the Scarborough Marsh in Scarborough.


Trails are intended primarily for pedestrians. They are distinct from pathways by surface type and width, often with a dirt surface and narrower width. The surface is not generally good for road bicycles but most trails, depending upon topography and where permitted, can be used by mountain bikes. Trails often primarily serve recreation purposes, such as loop trails through conservation lands. Local examples of trails are the Fore River Trail in Portland and the Great Pond Trail in Cape Elizabeth.


On-road Bikeway Network Summary

The regional on-road bikeway network is comprised of approximately 564 miles of bicycle lanes, paved shoulders, and shared lanes. Existing facilities total 224 miles, with 68% paved shoulders. Future facilities total 340 miles, with 82% paved shoulders. Table B-1 describes the distribution of these facilities across the PACTS municipalities.

Table B-1: On-Road Bikeway Network

Municipality

Bicycle Lane

Paved Shoulder

Shared Lane

Total (mi.)

Existing (mi.)

Future (mi.)

Existing (mi.)

Future (mi.)

Existing (mi.)

Future (mi.)

Biddeford

0.0

0.0

18.7

10.2

5.9

3.6

38.4

Cape Elizabeth

6.3

0.0

2.4

3.8

3.7

0.0

16.2

Cumberland

0.0

3.2

12.7

18.6

1.6

0.0

36.1

Falmouth

4.0

0.0

10.9

33.5

5.1

0.0

53.5

Freeport

0.0

0.0

16.0

9.6

21.6

0.0

47.2

Gorham

0.0

0.0

32.8

20.7

0.0

0.0

53.5

North Yarmouth

0.0

0.0

2.0

22.5

0.0

0.0

24.5

Old Orchard Beach

1.3

0.0

4.9

4.8

2.3

0.0

13.3

Portland

8.5

15.9

0.0

9.5

3.0

22.0

58.9

Saco

0.0

0.0

20.4

29.3

1.2

0.0

50.9

Scarborough

0.0

0.6

13.4

55.3

1.0

0.0

70.3

South Portland

2.0

6.8

6.8

7.2

4.0

1.7

28.5

Westbrook

0.0

3.3

11.0

16.2

0.4

0.0

30.9

Windham

0.0

0.0

0.0

28.2

0.0

0.0

28.2

Yarmouth

0.0

4.4

0.0

8.5

8.3

0.0

21.2

Totals (mi.)

22.1

34.2

152.0

277.9

58.1

27.3

571.6

Source: On-road Bikeway Network, Map B-1, dated October 30, 2009.


Significant Regional Pathway and Trail Initiatives

A number of regional-scale pathway project initiatives are underway which would link the PACTS region to other regions. These include:

  • Mountain Division Trail with Rail, Portland to Gorham (within PACTS) to Fryeburg
  • Eastern Trail, South Portland to Biddeford (within PACTS) to Kittery.

Five miles of the Mountain Division Trail is completed and paved in Windham, Gorham and Standish. A significant portion of the Eastern Trail is completed within the PACTS area including most of South Portland and from the Nonesuch River in Scarborough to near Cascade Road in Old Orchard Beach. New sections are to be constructed soon in Old Orchard Beach/Saco and Biddeford south.

The Mountain Division Trail is a substantial portion of the Sebago to the Sea Trail initiative to link Sebago Lake to Casco Bay. The Sebago to the Sea Trail branches to two distinct urban routes for the Westbrook to Portland section (a Stroudwater River branch and a Presumpscot River branch).

The East Coast Greenway, an urban greenway planned to stretch from Key West, Florida, to Calais, Maine, traverses the region. It is envisioned to be a network of mostly off-road pathways eventually but there is an on-road network that is designated in the interim. The Eastern Trail is the southerly section through the PACTS region. Streets and pathways from Portland to Freeport comprise the northerly section.

A pathway/trail with rail corridor is suggested for future evaluation linking Portland, from the Eastern Promenade Trail, to Freeport Village Center, adjacent to or within two active rail lines.

The proposed Nonesuch River Trail is a planned significant trail and greenway corridor connecting northern and western Scarborough with northwestern Saco/the Saco Heath Preserve.

A series of connected pathways from Yarmouth village center (extending the Beth Condon Pathway) to Freeport village center is suggested adjacent to and within the Route 1 corridor.


Cost Estimates to Implement the Future On-road Bikeway Networ

An order of magnitude cost estimate to establish the Future portion of the on-road bikeway network is approximately $80.2 million and includes:

  • $1.4 million to create 34 miles of bicycle lanes comprised of constructing 3.2 miles of bike lanes (the marginal cost only) and to sign and stripe an additional 31 miles of bike lanes
  • $78.5 million dollars to add 278 miles of paved shoulder (the marginal cost only)
  • $251,000 to sign and stripe 27 miles of shared lane bikeway facilities.

The largest percentage of this cost ($78.5 million) is to add paved shoulders to primarily suburban arterials and collector roads. Paved shoulders are rarely added independently of other road work (such as a pavement overlay or road reconstruction/rehabilitation) nor solely for their bicycle and/or pedestrian benefits. The shoulder costs identified are the marginal costs of adding the paved shoulder to a road (PACTS Collector Road Study). This level of investment in paved shoulders, complementary to the investments recommended in the PACTS Collector Road Study (2008), also increases motorist safety and improves pavement preservation and maintenance efforts.

These network costs do not include annual ongoing maintenance and preservation costs, such as pavement re-striping, pavement markings nor pavement resurfacing to maintain the facilities over the long-term.

Typical unit costs are shown in Table B-2.

Table B-2: On-Road Bikeway Unit Costs

Item

Units

Unit_Cost

Notes

Bicycle Lane – Urban

Mile

$9,600

Significant edge striping, pavement markings, signs (A)

Bicycle Lane – Rural

Mile

$4,800

Less intensive edge striping, pavement markings, signs (B)

Paved Shoulders – 4′

Mile

$300,000

Add 4′ paved shoulders to both sides of road (C)

Paved Shoulders – 5′

Mile

$360,000

Add 5′ paved shoulders to both sides of road (C)

Paved Shoulders – Urban

Mile

$4,800

Striping and route signage only (B), Portland only

Shared Lane Markings/Sharrows – Urban

Mile

$9,600

Significant edge striping, pavement markings, signs (A)

Shared Lane – Rural/Suburban

Mile

$4,800

Striping and Share the Road signage





Notes




(A). Based upon low bid in 2009 for Forest Avenue, Park Avenue, Deering Avenue bike lane/shared lane project.

(B). Estimated to be one half of (A) to account for lower road striping and signage requirements.

(C). Based upon PACTS Collector Road Study estimate of $6.80/sf for adding paved shoulders.


Next Section:

C. The Pedestrian Environment and Regional Commercial Centers

PACTS Regional Bike and Pedestrian Plan Update: Section E, Final Draft

December 4th, 2009


PACTS Regional Bicycle and Pedestrian Plan Update November 2009 Final Draft

Note to reader: This is section E of a 6 part report. To see the entire report click here.

THE FINAL REPORT IS AVAILABLE HERE.

Download this section as a PDF here.

E. Top Areas/Issues of Concern for Follow Up

During the series of meetings held as part of the Plan Update, a number of issues were raised that could not be addressed or fully resolved in the context of the project. This is a compilation of those issues that are recommended for PACTS follow-up.

  1. Regional, systematic approach to deploying ‘Share the Road’ signs. It is felt that these signs could be deployed in a more comprehensive and systematic way. (This item is included in the ‘Top Most Cost and Time Effective Regional Improvements.’)
  2. Re-visiting Roadway Design Criteria: Travel lane width, paved shoulder width, design speeds, clear zones, etc. The Maine Highway Design Guide and the AASHTO ‘Green Book’ are the most frequently used manuals for defining roadway standards. They also serve as the basis for many municipal road standards. Although flexibility in their application based upon engineering judgment is suggested, in many cases the defined standards do not fully reflect the context of the road (urban, suburban, rural) nor its adjacent land uses, and rely too heavily on functional classification for travel lane and pavement shoulder widths and design speeds.  The cumulative effect is often unintended consequences such as inducing higher traffic speeds, higher construction and maintenance costs, physical and visual impacts on community character, etc.
  3. Bicycle Access on the Amtrak Downeaster. The Downeaster service currently limits the stations where riders can board with bicycles.
  4. Consideration/Adoption of a Complete Streets Policy. There is not a Complete Streets Policies in effect now to influence roadway design and/or funding decisions/priorities.
  5. On-road bicycle facility type selection. Recent efforts to implement bicycle facilities locally have sometimes been met with community push-back. A review of options and opportunities for different types of bicycle facilities under various conditions/ situations would be invaluable to avoiding conflict. The issues often revolve around narrowing or removing travel lanes and/or removing one or two sides of on-street parking to create the room for bicycle lanes or shared lanes/wide curb lanes. Impacts on transit operations also need consideration.
  6. Sharing rail corridors with trails or pathways: information and dialogue. Efforts to share rail corridors are done piecemeal and typically ‘re-fighting the fight’ with every proposal. A more systematic approach is desirable to gain quicker and better outcomes for all.
  7. The need for bicycle and pedestrian counts. There is no systematic program for counting bicyclists and pedestrians or for gathering, organizing and making available the data. Good data is essential for good decision-making and monitoring success.
  8. Travel demand management. Portland has recently adopted and implemented its TDM ordinance. Should this be a municipality-by-municipality approach or a more regional approach?
  9. Bicycle Safety, Education and Promotion. There are consistent calls for more and effective cycling related safety, education and promotion efforts for cyclists and motorists: What types of programs, who takes the lead and where will funding come from?
  10. More connectivity. Contemporary residential and commercial development in the region has generally done little to create an inter-connected street network. This disproportionately increases traffic on the region’s arterial and collector streets and limits bicycling and walking opportunities – how can we increase connectivity?

Next Section

F:  Design Guidelines

PACTS Regional Bike and Pedestrian Plan Update: Section F, Final Draft

December 1st, 2009


PACTS Regional Bicycle and Pedestrian Plan Update November 2009 Final Draft

Note to reader: This is section F of a 6 part report. To see the entire report click here

THE FINAL REPORT IS AVAILABLE HERE.

Download this section as a PDF here.

F. Design Guidelines

The 1995 PACTS Regional Bicycle and Interim Pedestrian Plan contained comprehensive bicycle and pedestrian planning and design standards. In this Plan Update, selective guidelines are provided to round out the information provided in the 1995 Plan.

The 1995 Plan’s Standards are comprised of the following areas:

Bicycle Facilities

  • The First Step: Understanding the User
  • Bicycle Lanes
  • Paved Shoulders
  • Wide Curb Lanes
  • Multi-Use Trails (called Shared Use Pathways in the Plan Update)
  • Bicycle Support Facilities (Bicycle Parking/Signage/Lighting/Actuated Signals)
  • Bicycle Hazards
  • Roadway Maintenance

Pedestrian Facilities

  • Planning for Pedestrians
  • Local Planning Needs
  • Pedestrian Site Plan Checklist
  • Pedestrian Planning is Specific Development Types
  • Traffic Calming for Pedestrians
  • Pedestrian Design Guidelines
  • Intersection Design for Pedestrian Safety
  • Special Types of Intersections
  • Obstacle Countermeasures
  • Federal Requirements for Pedestrian Facilities
  • Pedestrian Facility Maintenance.

New planning and design guidelines include:

Sharrow, or Shared Lane Marking

Description:

  • Sharrow SymbolExperimental (through 2010) roadway marking used for ‘Shared Lane’ bicycle facilities, when motorists and bicyclists share the travel lane
  • Markings consist of a chevron and bicycle symbol

Purpose:

  • Sharrows assist bicyclists with lateral positioning in a shared lane with on-street parallel parking in order to reduce the chance of a bicyclists impacting the open door of a parked vehicle.
  • Assist bicyclists with lateral positioning in lanes that are too narrow for a motor vehicle and a bicycle to travel side by side within the same travel lane.
  • Alert road users of the lateral location bicyclists are likely to occupy within the traveled way.
  • Encourage safe passing of bicyclists by motorists.
  • Reduce the incidence of wrong-way bicycling.  (Source: MUTCD draft, 2008.)


Application:

  • Along street segments when there is not room for other types of on-road bicycle facilities such as paved shoulder or bicycle lanes.
  • Note: Until 2010, Sharrows are considered experimental and require approval from the FHWA for their use.

SharrowPlacement

Standards (Source: MUTCD draft, 2008):

  • Sharrows shall not be used on shoulders or in designated bicycle lanes.
  • Roads with on-street parking – Sharrows shall be placed so that the centers of the markings are at least 11 ft from the face of the curb or edge of pavement.


Guidance (Source: MUTCD draft, 2008):

  • Sharrows should not be placed on roads with speed limits over 35 mph.
  • If used, Sharrows should be placed immediately after an intersection and spaced at intervals not greater than 250 ft thereafter.
  • If used on a street without on-street parking with an outside lane less than 14 ft, the center of the Sharrows should be at least 4 ft from the face of the curb or the edge of the pavement where there is no curb.

SharrowCarpet

Additional Resources:


Bicycle Parking: Short-Term

back to top

Description:

  • Bicycle racks provide for secure, short-term bicycle parking
  • Several types of racks are more desirable based upon their design and functionality – racks that provide two points of contact (rather than one) are recommended



Standard Application:

Location and Design of Bicycle Parking Facilities

  • Bicycle parking should be located in close proximity to the building’s entrance (ideally within 50’) and clustered in lots not to exceed 16 spaces each.
  • Bicycle parking facilities shall support bicycles in a stable position without damage to wheels, frame or other components.
  • Bicycle parking facilities should be located in highly visible well-lighted areas to minimize theft and vandalism.
  • Bicycle parking facilities shall be securely anchored to the lot surface so they cannot be easily removed and shall be of sufficient strength to resist vandalism and theft.
  • Bicycle parking facilities shall not impede pedestrian or vehicular circulation, and should be harmonious with their environment both in color and design. Parking facilities should be incorporated whenever possible into building design or street furniture.
  • Racks must not be placed close enough to a wall or other obstruction so as to make use difficult. There must be sufficient space (at least 24 inches) beside each parked bike that allows access. This access may be shared by adjacent bicycles. An aisle or other space shall be provided to bicycles to enter and leave the facility. This aisle shall a minimum width of four (4) feet to the front or rear of a bike parked in the facility.
  • Paving is not required, but the outside ground surface shall be finished or planted in a way that avoids mud and dust.
  • Bike parking facilities within auto parking areas shall be separated by a physical barrier to protect bicycles from damage by cars, such as curbs, wheel stops, poles or other similar features.

(Source: Adapted from Santa Cruz Bicycle Ordinance.)


Number of Parking Spaces and Signs

  • The number of parking spaces provided shall be based upon an anticipated usage but not less than parking for two bicycles

Example: The City of Portland, Maine, requires 1 bicycle parking space for every 10 automobile parking spaces up to the first __ spaces and then __ spaces thereafter, with a minimum of two spaces.

  • Bicycle parking facilities shall be provided for any new building, addition or enlargement of an existing building, or for the change in the occupancy of any building that results in the need for additional auto parking facilities
  • When more than 10 bicycle parking spaces are required, half should be covered parking
  • Signage should clearly indicate the location of bicycle parking if it is not visible from the street or main building entrance.


Additional Resources:

Parking Guidelines


Parking Ordinance

Bicycle Parking

Complete Streets

back to top

Description:

  • Complete Streets are streets that safely provide a context appropriate level of access along and across streets for all users of a street — pedestrians, bicyclists, motorists, and transit riders — based upon the roadway and land use context. Complete streets are ‘accessible streets’ in the sense that they provide quality access for persons of all abilities (See ‘Accessible Streets’ Guidelines).
  • Each complete street is unique but they are typically comprised of all or many of the following design elements on arterial and collector streets, dependent upon the context:

* for pedestrians – continuous sidewalks (or a paved shoulder in rural settings), frequent safe street crossing opportunities/crosswalks, median islands/pedestrian refuge islands, accessible pedestrian signals, curb extensions

* for bicyclists – on-road bicycle facilities (bike lanes, paved shoulders, wide curb lanes or quiet neighborhood streets), bicycle parking at destinations

* for transit users – convenient, comfortable and accessible transit stops, transit information

* for motorists – clearly defined travel ways and signage, adequate capacity

* for all users – attractive streetscapes.


Standard Application:

  • Most all streets should be complete streets in the broadest sense. Based upon the roadway and land use context there will be differing levels of transportation facilities provided and accommodation of each mode, striking a balance appropriate for each situation. Urban complete streets will look and function very differently from rural complete streets.
  • Many existing streets can be and will need to be retrofitted to meet the definition of complete streets.
  • New streets should be designed to be complete streets.


Typical Elements of an Urban Complete Street:

C S Typical Elements

Retrofitting Existing Streets:

Many existing streets that lack quality facilities for all street users can be readily retrofitted to accommodate them within existing rights-of-way.


A Typical Village Setting


Standish Corner Village Setting


A ‘Road Diet’


Martins Pt. Road Diet

Route 1/Veranda Street in Portland, an important bicycle commuter route, was a four lane urban street with no shoulders converted to three lanes to create 5’ paved shoulders and to improve motorist safety in this redeveloping area.



A Best Practice Example (Source: City of Charlotte, NC.):

In 2007 Charlotte, NC, adopted new Urban Street Design Guidelines that prescribe

a planning and design process to result in complete streets. Key to this process is

the definition of street types that are related to but not dependent upon roadway

functional classification.

Guiding Principles of the Urban Street Design Guidelines:

Achieving a “Complete Street” Network

1) Streets are a critical component of public space.

2) Streets play a major role in establishing the image and identity of a city.

3) Streets provide the critical framework for current and future development.

4) Charlotte’s streets will be designed to provide mobility and support livability and

economic development goals.

5) The safety, convenience, and comfort of motorists, cyclists, pedestrians, transit

riders, and neighborhood residents will be considered when planning and

designing Charlotte’s streets.

6) Planning and designing streets must be a collaborative process, to ensure that a

variety of perspectives are considered.


Additional Resources:

www.charmeck.org/Departments/Transportation/Urban+Street+Design+Guidelines.htm


Accessible Streets

back to top

Description:

Accessible Streets provide safe and well-designed access along and across streets for street users of all abilities. Accessible streets in particular meet the access needs of persons with disabilities such as the blind and visually impaired, the deaf, and persons in wheelchairs. (See also, ‘Complete Streets.’)

Along Streets

(source: Designing Sidewalks and Trails for Access)

Along Streets


On commercial streets, the frontage zone separates pedestrians from store fronts and provides space for sidewalk cafes, window sills, store entrances, street vendors, and

doorways.

The pedestrian zone is the area of the sidewalk corridor that is specifically reserved for pedestrian travel. It should be a minimum of 5’ but in no instances less than 3’. 8’ is recommended in downtowns.

The planter/furniture zone is the area where any potential obstacles such as trees, parking meters, benches, bus shelters and signs are placed.


The curb zone (approx. 6”) is adjacent to the roadway and is an important cue to the  visually impaired to identify the border between the sidewalk and roadway.

The minimum width of cleared area for a sidewalk of 36” is only acceptable when:

  • A wider width is impossible
  • The narrow width continues for as short a distance as possible
  • Passing spaces are provided at intervals of no more than 200’.



At Intersections and Street Crossings

(source: Designing Sidewalks and Trails for Access)


Full accessibility at intersections and other street crossing locations is especially important for persons with disabilities.


At IntersectionsImportant intersection design features –

  • curb ramps oriented to crosswalks with detectable warnings [A]
  • sufficient level landing width at ramps [B]
  • accessible pedestrian signals (APS) [C] with audible beaconing, where warranted
  • sufficient crossing time
  • minimized crossing distances with pedestrian refuge islands (min. 6’ recommended) for crossings over 60’ [D]
  • minimized corner radii [E]
  • well-marked crosswalks [F]
  • countdown timers
  • good sight distance for pedestrians and vehicles
  • curb extensions [G] where feasible.



Accessible Pedestrian Signals (APS) – Purpose and Applications

“Pedestrians who are blind use audible and tactile cues in independent travel. At intersections with fixed-time signal phasing and consistent traffic flow, traffic light changes will be reflected in parallel or perpendicular traffic surges. The sounds of these surges are used by blind pedestrians to identify appropriate crossing intervals.

Intersections that have actuated signal timings, complex traffic patterns, or intermittent or sporadic traffic volumes may pose problems for pedestrians who have vision impairments. At these intersections, the signals for automobile and pedestrian traffic do not automatically correspond. Frequently, a separate WALK signal and phase is provided for pedestrians in response to a pushbutton. At this type of crossing (as well as at several other types, including midblock crossings where there is no parallel flow to rely on), an accessible pedestrian signal (APS) may be desirable to provide blind and low-vision pedestrians with an equivalent to the visual signal provided for other pedestrians.”

(Source: Accessible Rights-of-Way: A Design Guide, 1999.)


An Accessible Pedestrian Signal (APS) installation should:

• Provide pedestrian signal information to those who cannot see the pedestrian signal head across the street

• Provide information to pedestrians about the presence and location of pushbuttons, if pressing a button is required to actuate pedestrian timing

• Provide unambiguous information about the WALK indication, as well as which crossing is being signaled

• Use audible beaconing only where necessary

  • Put as little additional sound into the environment as possible to avoid disturbing neighbors and to allow pedestrians who are blind or visually impaired to hear the traffic sounds, as well as the APS.  (Source: Accessible Pedestrian Signals: Best Practice, NCHRP, 2007.)

Accessible Pedestrian Signals

APS ConfigPushbuttons and audible beacons (where necessary)

  • no closer than 10’ from each other
  • located within 10’ of curb
  • located no farther than 5’ from crosswalk.


Additional Resources:

  • http://www.access-board.gov/news/sidewalk-videos.htm. Accessible Sidewalks is a four-part video developed by the Access Board to illustrate issues and considerations in the design of sidewalks. The series covers access for pedestrians with mobility impairments, including those who use wheelchairs, and pedestrians who are blind or have low vision. The videos are open captioned and incorporate running descriptive audio.
  • Accessible Pedestrian Signals: A Guide to Best Practices, NCHRP, Web-only 117A, 2007.
  • Accessible Public Rights-of-Way: Planning and designing for alterations, 2007.
  • Designing Sidewalks and Trails for Access: Part II, Best Practices, FHWA, 2001.


Regional Bicycle Route & Destination Signage

back to top

Description
:

Regional Bicycle Route and Destination Signage is an integrated signage and route designation program to provide enhanced wayfinding to bicyclists to regional destinations such as village centers/downtowns and major tourist/recreation attractions.


Standard Application:

  • A route may consist of any combination of on-road (bike lane, paved shoulder, or shared lane) and/or off-road (shared use pathway) bicycle facilities.
  • The route should, as a minimum, safely accommodate moderately skilled bicyclists.
  • Desirable route characteristics include:
    • low to moderate volume roadways (under ~ 8,000 ADT preferred)
    • low to moderate speed traffic (posted for 35 mph or lower)
    • connections between major destinations and attractions
    • visually attractive
    • continuity of bicycle facilities – the type of bicycle facility should not change frequently.
  • Signage characteristics include:
    • meaningful route designation name
    • destination information and directional aids at decision points – destination name, distance and directional arrows (where needed)
    • attractive icon or logo to ‘brand’ the route
    • conformance to the latest Manual on Uniform Traffic Control Devices manual.

Bicycle Route Signs

Additional Resources: